OSWEGO — The State University of New York (SUNY) Oswego opened two new manufacturing laboratories in time for the fall semester.
The 13,000-square-foot labs are in Wilber Hall, Bob Lloyd, project coordinator for facilities design and construction, said in an email. The project cost $5.8 million, according to a news release, and funding came through SUNY Oswego’s Capital Plan, Lloyd said.
“We have vastly superior equipment than we had last semester, and it will only get better,” Dan Tryon, a technology professor at SUNY Oswego, said in the release.
(Sponsored)

Unique Ways to Save Money As You Upgrade Your Business Technology
It’s no secret that innovating is the key to business growth and prosperity. To stay competitive, businesses must continually seek new technologies to enhance productivity. However, the issue of cost

Working Another Job While on FMLA Leave is Not Necessarily Misconduct
Imagine this. You have an employee who is on leave pursuant to the Family and Medical Leave Act (FMLA) and you discover that the employee is working for another employer.
The labs are an addition to Wilber Hall, a 95,000-square-foot building, and feature a 3-D printer that can produce solid models, two computer numerical control routers, a laser cutter, and two new milling machines, Tryon says.
The labs also feature portable machines on wheels for easier reconfiguration, a dust-extraction system, air hoses hanging from the ceiling, and a smart-room system that automates equipment operation and shut down, according to the news release.
Other equipment, such as a four-axis computer numerical controlled router, industrial robots, and modern milling machines, will arrive during the first half of the semester, Tryon said. The new equipment can produce plastic models ranging from chess pieces to new mechanical inventions, according to the university.
The additions to Wilber Hall will have a positive impact on SUNY Oswego’s recruiting, Tryon says.
“We think it’s going to have a huge impact on our ability to attract students,” Tryon says. “We’ve only been open for a few weeks, but some of the parent and student that have been wandering around campus as part of the late summer orientation that have seen the spaces are already impressed.”
The project’s architect and engineer was Bergmann Associates of Rochester and its general contractor was PAC & Associates, Inc. of Oswego. The work also added a new multimedia classroom to Wilber Hall.
Contact Imbert at intern@cnybj.com